These pics show the hole preparation.
(Except for the cutting of the concrete
which isn't all that exciting.)

 

 

The beginning.

 

 

 

This is the hole rouged in.  Depth can be approximated by comparing with the 55 gallon drums in the background.  It's about 40".  The concrete parking lot is 6" thick.

 

Hole must be shaped very accurately and loose material must be removed.

 

All done.

BACK